By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Kashmir DigitsKashmir Digits
  • KASHMIR
  • JAMMU
  • EDUCATION
  • INDIA
  • Results
  • TECHNOLOGY
  • Admit Card
  • EDITORIAL
  • HEALTH
  • JAMMU
  • JKBOSE
  • JOBS
  • Kashmir University
  • PAKISTAN
  • SPORTS
  • SRINAGAR
  • SSC
  • VIDEOS
  • WORLD
  • Share Market Latest
Reading: Main Section of Longest Railway Tunnel in India T-49 in Completed in J&K. All You Need To Know.
Share
Notification Show More
Font ResizerAa
Kashmir DigitsKashmir Digits
Font ResizerAa
  • KASHMIR
  • JAMMU
  • EDUCATION
  • INDIA
  • Results
  • TECHNOLOGY
  • Admit Card
  • EDITORIAL
  • HEALTH
  • JAMMU
  • JKBOSE
  • JOBS
  • Kashmir University
  • PAKISTAN
  • SPORTS
  • SRINAGAR
  • SSC
  • VIDEOS
  • WORLD
  • Share Market Latest
  • KASHMIR
  • JAMMU
  • EDUCATION
  • INDIA
  • Results
  • TECHNOLOGY
  • Admit Card
  • EDITORIAL
  • HEALTH
  • JAMMU
  • JKBOSE
  • JOBS
  • Kashmir University
  • PAKISTAN
  • SPORTS
  • SRINAGAR
  • SSC
  • VIDEOS
  • WORLD
  • Share Market Latest
Have an existing account? Sign In
Follow US
  • Advertise
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
JAMMUKASHMIR

Main Section of Longest Railway Tunnel in India T-49 in Completed in J&K. All You Need To Know.

Sherjeel Malik
Last updated: February 16, 2022 12:47 pm
Sherjeel Malik
4 years ago
Share

The main tunnel of T-49, the longest tunnel of Indian Railways, between Sumber and Arpinchala station of Katra-Banihal section of Udhampur- Srinagar-Baramulla Rail Link (USBRL) project has been completed.

INDIA’S LONGEST TRANSPORTATION TUNNEL MADE THROUGH

Today a major milestone has been achieved by executing break-through of Tunnel T-49 between Sumber and Arpinchala Stations on on-going Katra-Banihal Section.#Infra4India pic.twitter.com/lHJVnoy6zu

— Northern Railway (@RailwayNorthern) February 15, 2022

“Breakthrough was achieved today in the presence of A K Khandelwal CAO/USBRL along with NR team, IRCON officers and the officers of Messrs HCC and Messrs AFCONS,” officials informed.

Officials said that out of 272 km length of the USBRL project, 161 km project was already commissioned and operationalized.

“The work of an intervening stretch of 111 km between Katra-Banihal is under progress at a rapid pace. Katra-Banihal section is traversing through hilly terrain of lower Himalayas, in which geology is a major challenge. It has several major bridges and very long tunnels which are under construction at different stages,” they stated.

Install Our AppDOWNLOAD
Join Telegram ChannelJOIN NOW
Join Facebook GroupJOIN NOW
Subscribe YouTube ChannelSUBSCRIBE
Follow On TwitterFOLLOW
Follow On InstagramFOLLOW

Here are key things to know about T-49:

  • The south portal of the tunnel is located at an altitude of 1400 metres, while its north portal is located at an altitude of 1600 metres.
  • The T-49 tunnel has been constructed using the New Austrian Tunneling Method (NATM), a modern technique of drill and blast method. The Northern Railway said that the cross section profile of the tunnel is modified horseshoe-shaped.
  • The NATM is also known as the sequential excavation method (SEM). It uses the strength of the surrounding soil to the greatest extent possible to strengthen the tunnel structure. The NATM promotes constant monitoring.
  • Being an SEM, the operation occurs sequentially to take most advantage of the ground conditions.
  • T-49 tunnel has two tubes – one is the main tunnel and other being escape tunnel. As per international standards, the escape tunnel being constructed parallel to the main tunnel is connected by cross passages at an interval of 375m to facilitate rescue and restoration work.
  • The tunnel has a ruling gradient 1 in 80 and designed speed of 100 kmph.
  • The Northern Railway said that during construction activities, local population was employed by agencies for various works.
  • Out of 272 km length of USBRL project, 161 kilometres has already been commissioned and operationalised.
  • The work of the intervening stretch of 111 kilometre between Katra Banihal is under progress at rapid pace, the railways said.
  • It added that several challenges were encountered in the course of construction such as shear zone, perched aquifer, and highly jointed rock mass, rock problems of squeezing and high ingress of water.

Share This Article
Facebook Whatsapp Whatsapp Telegram Email Copy Link Print
BySherjeel Malik
Follow:
Sherjeel Malik is a content writer at Kashmir Digits. Apart from covering current affairs, Sherjeel likes to create content about sports and write opinion based articles.
Previous Article Tanishq Srinagar Job Recruitment 2022
Next Article IUST Job Recruitment 2022: Engineers, Legal Assistant and other posts

Latest

J&K Govt Issues Tentative Seniority List for Police Gazetted Service – Commissioner Rank
KASHMIR
J&K Home Department Issues Tentative Seniority List of Police Gazetted Officers (Director/Special Director/Additional Director)
KASHMIR
Tentative Seniority List of JKPS Officers in SSP Rank
J&K Home Department Issues Tentative Seniority List of JKPS Officers in SSP Rank
KASHMIR
Pakistan Vs Sri Lanka 2nd ODI Called Off As 8 Sri Lanka Players Refuse To Play Due To Security Threat: Report
INDIA PAKISTAN SPORTS
Delhi Red Fort Blast Live: MHA hands over probe to NIA; father of suspect detained in J&K Pulwama
INDIA
IIM Jammu Job Recruitment
JAMMU JOBS
SBI kashmirdigits
State Bank of India Job Recruitment 2025
JAMMU JOBS KASHMIR
Govt Declares Paid Holiday – Check dates
JAMMU KASHMIR
Chief Education Officer Rajouri objection Notice
KASHMIR
J&K School Education Department Posts Answer Key
JOBS

Kashmir Digits Magazine is dedicated to the perpetuation of a free press for Students, Aspirants and independent Organisation as the cornerstone of our mission and movement here at Kashmir Digits.

Find Us on Socials

2025 © Kashmir Digits Media Network. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?