By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Kashmir DigitsKashmir Digits
  • KASHMIR
  • JAMMU
  • EDUCATION
  • INDIA
  • Results
  • TECHNOLOGY
  • Admit Card
  • EDITORIAL
  • HEALTH
  • JAMMU
  • JKBOSE
  • JOBS
  • Kashmir University
  • PAKISTAN
  • SPORTS
  • SRINAGAR
  • SSC
  • VIDEOS
  • WORLD
  • Share Market Latest
Reading: Centre Sanctions 4 Lanning of Srinagar-Uri National Highway, Budget Outlay of Rs. 823.45 Cr.
Share
Notification Show More
Font ResizerAa
Kashmir DigitsKashmir Digits
Font ResizerAa
  • KASHMIR
  • JAMMU
  • EDUCATION
  • INDIA
  • Results
  • TECHNOLOGY
  • Admit Card
  • EDITORIAL
  • HEALTH
  • JAMMU
  • JKBOSE
  • JOBS
  • Kashmir University
  • PAKISTAN
  • SPORTS
  • SRINAGAR
  • SSC
  • VIDEOS
  • WORLD
  • Share Market Latest
  • KASHMIR
  • JAMMU
  • EDUCATION
  • INDIA
  • Results
  • TECHNOLOGY
  • Admit Card
  • EDITORIAL
  • HEALTH
  • JAMMU
  • JKBOSE
  • JOBS
  • Kashmir University
  • PAKISTAN
  • SPORTS
  • SRINAGAR
  • SSC
  • VIDEOS
  • WORLD
  • Share Market Latest
Have an existing account? Sign In
Follow US
  • Advertise
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
JAMMUKASHMIR

Centre Sanctions 4 Lanning of Srinagar-Uri National Highway, Budget Outlay of Rs. 823.45 Cr.

Sherjeel Malik
Last updated: June 29, 2022 1:12 pm
Sherjeel Malik
3 years ago
Share

Centre sanctioned four lanning of Srinagar-Baramulla-Uri section of the highway in Kashmir.

Minister of Road, Transport and Highways, Nitin Gadkari tweeted: “Construction of 4-Lane with paved shoulder of Srinagar – Baramulla- Uri section of NH-01 on EPC mode has been sanctioned in the UT of J&K under project BEACON, BRO with a budget outlay of Rs. 823.45 cr.”

The project was in limbo for a long time and in fact, the process of land acquisition for the Srinagar-Baramulla section was started in February this year.

Install Our AppDOWNLOAD
Join Telegram ChannelJOIN NOW
Join Facebook GroupJOIN NOW
Subscribe YouTube ChannelSUBSCRIBE
Follow On TwitterFOLLOW
Follow On InstagramFOLLOW

As part of the four-lane project, two flyovers would be constructed at Sangrama and Delina, Baramulla. Besides, the decision of by-pass at Baramulla and Pattan too would be decided after taking the assessment report into account.

The road stretch is around 100 kms and after completion of this project, the highway will be four-lane upto the border town Uri which is right on the LoC.

Share This Article
Facebook Whatsapp Whatsapp Telegram Email Copy Link Print
BySherjeel Malik
Follow:
Sherjeel Malik is a content writer at Kashmir Digits. Apart from covering current affairs, Sherjeel likes to create content about sports and write opinion based articles.
Previous Article Basant Rath To Join BJP To Fight Against Mehbooba And Omer?
Next Article ‘Lodge Complaint Against Overcharging Of Qurbani Animals & Bakery’ J&K Admin Tells People.

Latest

JKBOSE Class 10th Result in January 2026
EDUCATION
J&K Minimum Temperatures Recorded Today
JAMMU KASHMIR
JK Minimum Temperatures Recorded Today
JAMMU KASHMIR
J&K Minimum Temperatures Recorded Today
JAMMU KASHMIR
JK Police Constable Admit Card Download Direct Link
JAMMU KASHMIR
J&K Bank
J&K Bank Recruitment
JAMMU JOBS KASHMIR
Winter Vacations Announced in Kashmir
KASHMIR
GMC-Jammu Kashmirdigits
GMC Jammu Last Date Extended
JAMMU
Winter vacation upto 8th standard from first week of December: Sakina Itoo
EDUCATION
Power Shutdown Notified for Kashmir Parts Kashmirdigits
JK Power Shutdown Schedule for 20th To 22 Nov 2025
JAMMU KASHMIR

Kashmir Digits Magazine is dedicated to the perpetuation of a free press for Students, Aspirants and independent Organisation as the cornerstone of our mission and movement here at Kashmir Digits.

Find Us on Socials

2025 © Kashmir Digits Media Network. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?