Nearly three weeks after a devastating fire ravaged the Bone & Joint Hospital at Barzulla, the facility has refurbished its main Operation Theatre enabling the hospital to carry out elective surgeries.
Medical Superintendent B&J Hospital, Dr Suhail Mian said that the hospital reconstructed parts of OT and refurbished the equipment to help the patients who had been left in lurch after the hospital suffered the fire.
Install Our App | DOWNLOAD |
Join Telegram Channel | JOIN NOW |
Join Facebook Group | JOIN NOW |
Subscribe YouTube Channel | SUBSCRIBE |
Follow On Twitter | FOLLOW |
Follow On Instagram | FOLLOW |
“Ours is the only fully equipped Trauma and Orthopedics Hospital in J&K and due to unavailability of the OT, patients were suffering a lot,” he said.
He said the OT was made functional in a record time and the doctors have already started operating the patients that required immediate surgical intervention.
The Hospital had made its emergency OT functional last week and had resumed OPD and plaster services, along with diagnostic tests. Dr Mian said the Government and the GMC Administration were working together to resume the stalled facilities and services at the hospital. “We are repairing and renovating whatever we can and continuously,” he said.
However, due to unavailability of the wards, the hospital is facing a tough time housing the patients that require admission. Nearly 50 beds in the hospital have been operationalised to admit trauma cases. The two floors that housed the wards have not yet been cleared for operations by the authorities.
The 200 bedded hospital associated with GMC Srinagar has been the mainstay of Road Traffic Accidents and other trauma cases in Kashmir, and from across the districts in Pir Panjal. The tertiary care Orthopedics facility is the largest in J&K.
After the fire incident, SKIMS Medical College Hospital expanded its bed capacity for orthopedics to 90 beds from the existing 30.