By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Kashmir DigitsKashmir Digits
  • KASHMIR
  • JAMMU
  • EDUCATION
  • INDIA
  • Results
  • TECHNOLOGY
  • Admit Card
  • EDITORIAL
  • HEALTH
  • JAMMU
  • JKBOSE
  • JOBS
  • Kashmir University
  • PAKISTAN
  • SPORTS
  • SRINAGAR
  • SSC
  • VIDEOS
  • WORLD
  • Share Market Latest
Reading: Chenab Bridge To Bring All-Weather Rail Connectivity To Kashmir: Ministry of Railways
Share
Notification Show More
Font ResizerAa
Kashmir DigitsKashmir Digits
Font ResizerAa
  • KASHMIR
  • JAMMU
  • EDUCATION
  • INDIA
  • Results
  • TECHNOLOGY
  • Admit Card
  • EDITORIAL
  • HEALTH
  • JAMMU
  • JKBOSE
  • JOBS
  • Kashmir University
  • PAKISTAN
  • SPORTS
  • SRINAGAR
  • SSC
  • VIDEOS
  • WORLD
  • Share Market Latest
  • KASHMIR
  • JAMMU
  • EDUCATION
  • INDIA
  • Results
  • TECHNOLOGY
  • Admit Card
  • EDITORIAL
  • HEALTH
  • JAMMU
  • JKBOSE
  • JOBS
  • Kashmir University
  • PAKISTAN
  • SPORTS
  • SRINAGAR
  • SSC
  • VIDEOS
  • WORLD
  • Share Market Latest
Have an existing account? Sign In
Follow US
  • Advertise
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
JAMMUKASHMIR

Chenab Bridge To Bring All-Weather Rail Connectivity To Kashmir: Ministry of Railways

Sherjeel Malik
Last updated: June 23, 2022 5:14 pm
Sherjeel Malik
4 years ago
Share

Ministry of Railways on Thursday said that the world’s highest rail bridge, which is being built across Chenab River in Jammu and Kashmir will soon bring all-weather rail connectivity to Kashmir.

The bridge will provide the much-needed all-weather connectivity between Kashmir and the rest of the county. “With 88% completion of deck launching, Chenab bridge will soon bring all-weather rail connectivity to Kashmir,” informed Ministry of Railways on it’s official twitter handle.

Install Our AppDOWNLOAD
Join Telegram ChannelJOIN NOW
Join Facebook GroupJOIN NOW
Subscribe YouTube ChannelSUBSCRIBE
Follow On TwitterFOLLOW
Follow On InstagramFOLLOW

Notably, this bridge is world’s highest railway bridge as a part of the ambitious Udhampur-Srinagar-Baramulla rail link (USBRL) project and is being constructed by the Northern Railway at an estimated cost of 28,000 crores. (KNO)

Share This Article
Facebook Whatsapp Whatsapp Telegram Email Copy Link Print
BySherjeel Malik
Follow:
Sherjeel Malik is a content writer at Kashmir Digits. Apart from covering current affairs, Sherjeel likes to create content about sports and write opinion based articles.
Previous Article Oneness Nation Recruitment 2022.
Next Article markets60 скачать, Инстафорекс скачать терминал

Latest

Srinagar airport
Srinagar airport could face 15-day closure
KASHMIR SRINAGAR
Donald Trump
Iran-US war – Donald Trump says peace talks continue after Iran’s threat
WORLD
LPG
LPG prices go up, check details
INDIA
Srinagar airport
Planning a Kashmir trip? A key update on Srinagar airport could affect your travel dates
INDIA KASHMIR SRINAGAR
Virat Kohli
IPL 2026: Virat Kohli leads RCB to second IPL title in a row
INDIA
MBBS
National Medical Commission pitches change MBBS completion limit in India
INDIA
dr-farooq-abdullah
NEET UG 2026 – NC’s Farooq Abdullah demands probe, puts BJP on spot
JAMMU KASHMIR
Donald Trump
Iran and US reach deal, await Donald Trump’s approval – Reports
WORLD
NEET UG
NEET UG refund – NTA extends deadline for submission of bank details
EDUCATION INDIA
Donald Trump
“Blow Them Up” – Donald Trump Threatens Oman amid tensions with Iran
WORLD

Kashmir Digits Magazine is dedicated to the perpetuation of a free press for Students, Aspirants and independent Organisation as the cornerstone of our mission and movement here at Kashmir Digits.

Find Us on Socials

2026 © Kashmir Digits Media Network. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?