By using this site, you agree to the Privacy Policy and Terms of Use.
Accept
Kashmir DigitsKashmir Digits
  • KASHMIR
  • JAMMU
  • EDUCATION
  • INDIA
  • Results
  • TECHNOLOGY
  • Admit Card
  • EDITORIAL
  • HEALTH
  • JAMMU
  • JKBOSE
  • JOBS
  • Kashmir University
  • PAKISTAN
  • SPORTS
  • SRINAGAR
  • SSC
  • VIDEOS
  • WORLD
  • Share Market Latest
Reading: Ramban Tunnel Collapse: 2 More Bodies Recovered, Toll Reaches 4.
Share
Notification Show More
Font ResizerAa
Kashmir DigitsKashmir Digits
Font ResizerAa
  • KASHMIR
  • JAMMU
  • EDUCATION
  • INDIA
  • Results
  • TECHNOLOGY
  • Admit Card
  • EDITORIAL
  • HEALTH
  • JAMMU
  • JKBOSE
  • JOBS
  • Kashmir University
  • PAKISTAN
  • SPORTS
  • SRINAGAR
  • SSC
  • VIDEOS
  • WORLD
  • Share Market Latest
  • KASHMIR
  • JAMMU
  • EDUCATION
  • INDIA
  • Results
  • TECHNOLOGY
  • Admit Card
  • EDITORIAL
  • HEALTH
  • JAMMU
  • JKBOSE
  • JOBS
  • Kashmir University
  • PAKISTAN
  • SPORTS
  • SRINAGAR
  • SSC
  • VIDEOS
  • WORLD
  • Share Market Latest
Have an existing account? Sign In
Follow US
  • Advertise
  • Advertise
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
JAMMUKASHMIR

Ramban Tunnel Collapse: 2 More Bodies Recovered, Toll Reaches 4.

Sherjeel Malik
Last updated: May 21, 2022 5:14 pm
Sherjeel Malik
4 years ago
Share

Two more dead bodies of labourers were recovered from the debris of the under-construction tunnel which collapsed near Khooni Nallah area of Ramban district, taking the death toll to 4, while the search continues to find those still trapped.

“Fourth body retrieved and being shifted to District Hospital Ramban. The operation continues. NH44 through for vehicular traffic, ” Deputy Commissioner Ramban said in a statement.

Install Our AppDOWNLOAD
Join Telegram ChannelJOIN NOW
Join Facebook GroupJOIN NOW
Subscribe YouTube ChannelSUBSCRIBE
Follow On TwitterFOLLOW
Follow On InstagramFOLLOW

The operation to rescue the labourers trapped under the debris following the collapse of an under-construction tunnel on the Jammu-Srinagar national highway resumed early on Saturday after a fresh landslide forced the authorities to suspend the process last evening, officials said.

The audit tunnel of T3 on the highway near Khooni Nallah In Jammu and Kashmir’s Ramban district caved in at the start of the work around 10:15 pm on Thursday.

The body of one worker was recovered on Friday itself while three bodies were recovered today.

Share This Article
Facebook Whatsapp Whatsapp Telegram Email Copy Link Print
BySherjeel Malik
Follow:
Sherjeel Malik is a content writer at Kashmir Digits. Apart from covering current affairs, Sherjeel likes to create content about sports and write opinion based articles.
Previous Article 6 Houses Engulfed As Fire Breaks Out In Dalgate Srinagar.
Next Article AM Tata Jammu Recruitment 2022.

Latest

JKBOSE Class 10th Result in January 2026
EDUCATION
J&K Minimum Temperatures Recorded Today
JAMMU KASHMIR
JK Minimum Temperatures Recorded Today
JAMMU KASHMIR
J&K Minimum Temperatures Recorded Today
JAMMU KASHMIR
JK Police Constable Admit Card Download Direct Link
JAMMU KASHMIR
J&K Bank
J&K Bank Recruitment
JAMMU JOBS KASHMIR
Winter Vacations Announced in Kashmir
KASHMIR
GMC-Jammu Kashmirdigits
GMC Jammu Last Date Extended
JAMMU
Winter vacation upto 8th standard from first week of December: Sakina Itoo
EDUCATION
Power Shutdown Notified for Kashmir Parts Kashmirdigits
JK Power Shutdown Schedule for 20th To 22 Nov 2025
JAMMU KASHMIR

Kashmir Digits Magazine is dedicated to the perpetuation of a free press for Students, Aspirants and independent Organisation as the cornerstone of our mission and movement here at Kashmir Digits.

Find Us on Socials

2025 © Kashmir Digits Media Network. All Rights Reserved.
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?